WIKA operating instructions bypass level indicator model BNA
112195.01 11/2012 GB/D
3. Installation and commissioning
The bypass level indicator is mounted in a vertical position on the vessel
to be monitored using the process connections (1) provided. Seals
(2), screws (3), washers (4) and nuts (5) suitable for the process
connection must be used. Choose a seal with a suitable corrosion
resistance. If necessary, shut-o valves must be mounted between the
vessel and the bypass.
Please heed the usual torque values of screws used in
pipetting work. The bypass level indicator must be installed
without tension. Suitable seals must be used. Care must
be taken that the seal material is resistant to the medium
and its vapours as well as to the temperature and pressure
loads to be expected.
Installing the oat
Clean the oat of anything stuck on it in the area of the oat magnet
system
Remove the base ange (7) and insert the oat (6) into the tube
from the bottom (the marking "top" or a legible model code marks the
top side of the oat)
Place the seal (9) onto the base ange. Replace the base ange
and x it in place using the screws (8)
Commissioning
If the bypass level indicator is tted with shut-o valves between
process connections and tank, proceed as follows.
Close draining and bleeding ttings on the bypass level indicator
with Plexiglass attachments, the oat must be moved up and down
inside the tube. For magnetic roller displays with ushing connections,
these connections must have an airtight seal. Please refer in this case
to the mounting and operating instructions for WIKA magnetic roller
displays with ushing connections as well.